MIL-DTL-22442G
4.6.5 Humidity. The unit shall be tested in accordance MIL- STD-810, Method 507, except
as follows:
a. Step 2. The chamber temperature shall be 71°C.
b. Step 4. Maintain 85 percent or greater relative humidity and reduce internal chamber
temperature in 16 hours to 28 ±10 °C.
c. Step 5. Delete.
d. Step 6. Repeat steps 2, 3, and 4 for a total of 10 cycles (not less than 240 hours).
e. Step 7. The cable assembly shall be operated within one hour following completion of
the 10th cycle, and shall be tested to verify compliance with operational requirements.
4.6.6. Thermal shock. The non-operating cable assembly shall meet all operational
requirements when subjected to thermal shock in accordance with MIL-STD-810, Method 503,
Procedure II. For step 1, low temperature shall be 32 °C. For step 2, high temperature shall be
+71°C. The unit shall be cycled through three cycles of low and high temperature.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified
in the contract or order (see 6.2). When packaging of materiel is to be performed by DoD or in-
house contractor personnel, these personnel need to contact the responsible packaging activity to
ascertain packaging requirements. Packaging requirements are maintained by the Inventory
Control Point's packaging activities within the Military Services or Defense Agency, or within
the military service's system commands. Packaging data retrieval is available from the
managing Military Department's or Defense Agency's automated packaging files, CD-ROM
products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is
not mandatory.)
6.1 Intended use. The cable assemblies covered by this specification are intended for use in
military aircraft. They are military unique because they have to connect existing military
communication sets with the pilot's earphones and microphones. There are no commercial
equivalents or applications.
6.2 Acquisition requirements. Acquisition documents should specify the following:
a. Title, number, and date of the specification.
20
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business